Views:

If a Demand Resource (DR) is unable to demonstrate performance of at least 50% of the registered MW capability of the DR, the DR must retest the underperforming portion(s) of the DR or create separate registrations for the portions of the DR that did not exceed the 50% performance threshold. If this condition occurs, the DR may still qualify for the Planning Resource Auction (PRA) by opting out of the testing requirement, provided that the DR will then be subject to the three (3) times penalty provisions for underperformance.
 
REFERENCE
BPM-11 Resource Adequacy