All Generation Resources, External Resources, Demand Response Resources (DRR) backed by behind-the-meter generation (BTMG), and BTMG that intend to qualify as  Planning Resources are required to perform a real power test or provide past operational data that meets these requirements to determine the resource’s GVTC and submit the GVTC data to MISO’s PowerGADS through the MISO Market Portal. 

 

More information on GVTC Testing Requirements can be found in the Resource Adequacy Business Practices Manual (BPM-011) Appendix J.