Description: Process allows for generation asset transfer outside of usual commercial model update cycle.
Keywords: Generator, Transfer, Model, Modeling, Ad Hoc, Register, Registration
Views: 20
Published On: Jan 26, 2021
Description: Generation Interconnection applicants should determine whether their resource is located within MISO territory before identifying a POI.
Keywords: Generation Interconnection, GI, Location, Locate, Resource, Unit, Point of Interconnection, GI Application, Transmission
Views: 33
Published On: Jan 26, 2021