Description: Resources committed in the Planning Resource Auction (PRA) may change their ownership from one Asset Owner (AO) to another throughout the plan year.
Keywords: AO, Asset Owner, Change, PRA, Planning, Auction, Resource Adequacy, MECT, Module E
Views: 33
Published On: Jan 26, 2021
Description: Battery storage resources are eligible to qualify as a BTMG-type Load Modifying Resources (LMR).
Keywords: Battery Storage, Resource, Qualify, Eligible, LMR. Load Modifying, Resource Adequacy, Planning, Accreditation, Behind the Meter, BTMG
Views: 97
Published On: Jan 26, 2021
Description: Under defined criteria, ICAP Deferrals allow Market Participants (MPs) to participate in the Planning Resource Auction (PRA) using Zonal Resource Credits (
Keywords: ICAP, Installed Capacity, Planning, Resource, Auction, Resource Adequacy, Zonal, Credit
Views: 59
Published On: Jan 26, 2021
Description: Market Participants (MP) must confirm asset changes prior to the Commercial Model update.
Keywords: Demand Resource, DR, Registration, Confirm, Resource Adequacy, Planning, Fixed Resource Adequacy, FRAP, Deadline
Views: 36
Published On: Jan 26, 2021
Description: Load Modifying Resources (LMR) include Behind-the-Meter Generation (BTMG) and Demand Resources (DR) available during capacity and trans. emergencies
Keywords: Demand Resource, DR, Test, LMR, Behind the Meter, BTMG, Module E-1, Requirements, Resource Adequacy, Planning, Emergency Capacity
Views: 17
Published On: Jan 26, 2021
Description: emand Response (DR) Testing Requirements
Keywords: LMR, Load Modifying Resource, Behind the Meter, Demand Resource, Resource Adequacy, Planning, Module E, Module E-1
Views: 26
Published On: Jan 26, 2021
Description: Describes resources included in Demand Response 2 testing requirements
Keywords: Demand Response, DR 2, DR, LMR, Load Modifying, Behind the Meter, Module E, Module E-1, Resource Adequacy, Planning
Views: 16
Published On: Jan 26, 2021
Description: Defines and describes XEFORd (Equivalent Forced Outage Rate Demand)
Keywords: XEFORd, GADS, Generator Data, Resource Adequacy, Planning, Forced Outage,
Views: 268
Published On: Jan 26, 2021
Description: Zonal Resource Credit (ZRC) transactions allow two Market Participants to exchange Zonal Resource Credits (ZRCs).
Keywords: ZRC, Zonal Resource Credit, Resource Adequacy, Transfer, Exchange, Resource Adequacy
Views: 44
Published On: Jan 26, 2021
Description: Describes the Fixed Resource Adequacy Plan requirements.
Keywords: Fixed Resource Adequacy, Plan, Planning, FRAP, Resource Adequacy, Planning Reserve Margin, Local Clearing, Local Resource, Submit
Views: 95
Published On: Jan 26, 2021
Description: Describes the Fixed Resource Adequacy Plan
Keywords: Fixed Resource, FRAP, Zonal Resource Credit, ZRC, Resource Adequacy, Planning, Reserve Margin, Local Clearing, Local Resource
Views: 147
Published On: Jan 26, 2021
Description: Full Responsibility Transactions (FRT)
Keywords: FRT, Full Responsibility, Transaction, Load obligation, MECT, Module E, Capacity Tracking, Resource Adequacy, Planning
Views: 28
Published On: Jan 26, 2021
Description: Market Participants may assume load obligation(s) for another Market Participant entering a FRT in the MECT.
Keywords: Load obligation, FRT, Full Responsibility Transaction, Module E, Capacity Tracking, MECT, Resource Adequacy, Planning
Views: 12
Published On: Jan 26, 2021
Description: Types of data imported to MISO PowerGads system.
Keywords: GADS, Generator Availability Data, Import, PowerGADS, Resource Adequacy, Planning
Views: 90
Published On: Jan 26, 2021
Description: Generating resources are required to submit GADS data to MISO.
Keywords: GADS, Generator Availability Data, Data Types, Generation, Resource Adequacy, Planning, Report, Required, Submit
Views: 272
Published On: Jan 26, 2021
Description: Generation Resources greater than or equal to 10 MW (based on Generation Verification Tested Capacity (GVTC)) must submit their Generator Availability Data
Keywords: GADS, Generator Availability, Add, PowerGADS, GVTC, Capacity, Resource Adequacy, Planning
Views: 9
Published On: Jan 26, 2021
Description: Generation resources greater than 10 MW are required to submit GADS data to MISO.
Keywords: GADS, Generator Availability, Report Required, Resource, PowerGADS, Resource Adequacy, Planning
Views: 419
Published On: Jan 26, 2021
Description: GADS data must be submitted on a quarterly basis.
Keywords: GADS, Generator Availability, Reporting, Timeline, Resource Adequacy, Planning
Views: 51
Published On: Jan 26, 2021
Description: Resource types required to submit GADS data to MISO.
Keywords: GADS, Resource, Type, Required to submit, PowerGADS, Resource Adequacy, Planning
Views: 44
Published On: Jan 26, 2021
Description: PowerGADS data entry is locked after the submission deadline has passed.
Keywords: GADS, Generator Availability Data, PowerGADS, Unlock, Resource Adequacy, Planning, Capacity
Views: 13
Published On: Jan 26, 2021
Description: Describes testing requirements for generator capability in MISO.
Keywords: Resource Adequacy, Generator, Testing, Summer Peak, Winter Peak, Net Capability, Planning
Views: 20
Published On: Jan 26, 2021
Description: Corrections for Air Temperature, Relative Humidity and Cooling Water Temperature are applied based on unit type.
Keywords: GVTC, Generator Verification Test, Correction, Resource Adequacy, Planning
Views: 46
Published On: Jan 26, 2021
Description: MPs representing Generation Resources are required to use reasonable efforts to submit GVTC by October 31 prior to the upcoming Planning Year
Keywords: GVTC, Extension, Reporting Deadline, Resource Adequacy, Submit, Generator, Verification, Planning Year
Views: 30
Published On: Jan 26, 2021
Description: Brief description of GVTC value and location of summer peak date and time.
Keywords: GVTC, Generator, Verification, Test, Capacity, Resource Adequacy, Planning, Summer, Peak, Planning
Views: 27
Published On: Jan 26, 2021
Description: Generation Verification Test Capacity data must be submitted annually.
Keywords: Generator Verification Test Capacity, GVTC, Timeline, Resource Adequacy, PowerGADS, GADS, Planning Year
Views: 297
Published On: Jan 26, 2021
Description: Planning Resources are maintained for each Local Resource Zone (LRZ) to meet the MISO footprint’s Planning Reserve Margin Requirement (PRMR).
Keywords: PRMR, Calculated, Calculation, Planning Reserve Margin, Local Resource Zone, Planning, Resource Adequacy
Views: 62
Published On: Jan 26, 2021
Description: MISO will adjust the Market Participant’s credit requirements within ten (10) Business Days of the full ICAP being met and validated by MISO.
Keywords: ICAP, Defer, Deferral, Credit Requirement, Resource Adequacy, Planning, Auction, Request
Views: 22
Published On: Jan 26, 2021
Description: ICAP Deferrals allow Market Participants (MPs) to participate in the Planning Resource Auction (PRA) using Zonal Resource Credits (ZRCs) that meet defined
Keywords: ICAP, Installed Capacity, Defer, Deferral, Planning Resource Auction, Zonal Resource Credit, Resource Adequacy
Views: 7
Published On: Jan 26, 2021
Description: MISO will determine the import and export limits for each Local Resource Zone (LRZ) by performing a transfer analysis study.
Keywords: LCR, Local Clearing, Local Resource Zone, LRZ, Resource Adequacy, Planning
Views: 90
Published On: Jan 26, 2021
Description: Describes LRZ purpose, how they are determined and details.
Keywords: LRZ, Local Resource Zone, Planning, Demand, Loss of Load, Resource Adequacy
Views: 281
Published On: Jan 26, 2021
Description: A sufficient volume of Planning Resources must be located in the same LRZ as the LSE's PRMR to meet the LRZ's LCR
Keywords: A sufficient volume of Planning Resources must be located in the same Local Resource Zone (LRZ) as the Load Serving Entities’ (LSE) Planning Reserve Margin Requirement (PRMR) to meet the LRZ’s Local Clearing Requirement (LCR).
Views: 15
Published On: Jan 26, 2021
Description: MISO Communication System (MCS) Monthly Availability Data
Keywords: MCS, Communication System, Monthly Availability, LMR, Load Modifying, MECT, Module E, Resource Adequacy, Planning
Views: 21
Published On: Jan 26, 2021
Description: MISO reports monthly and annual peak load for the past calendar year every June.
Keywords: Peak, Load, Resource Adequacy, Planning, Monthly, Annual, Historical, Summer Peak, Forecast
Views: 789
Published On: Jan 26, 2021
Description: Each Load Serving Entity’s (LSE’s) total obligation will be referred to as the Planning Reserve Margin Requirement (PRMR).
Keywords: Planning Reserve Margin Requirement, PRMR, Zonal Resource Credit, Resource Adequacy, Planning
Views: 62
Published On: Jan 26, 2021
Description: MISO’s PRA mechanics provide LSEs in MISO an option to procure Planning Resources through an annual auction process known as the Planning Resource Auction
Keywords: PRA, RA, Planning, Auction, LRZ, Load Reserve Zone
Views: 66
Published On: Jan 26, 2021
Description: Market Participants serving load within MISO must submit a Non-Coincident Peak Load forecast(s) each year by midnight November 1st.
Keywords: Non-Coincident Peak, Submit, Load Forecast, Resource Adequacy, Planning, Summer, Winter, Seasonal
Views: 21
Published On: Jan 26, 2021
Description: Market Participants serving load within MISO must submit an Energy For Load forecast(s) each year by midnight November 1.
Keywords: Submit, Energy, Load Forecast, Resource Adequacy, Planning Year, Peak Load, Seasonal, MECT, Module E
Views: 15
Published On: Jan 26, 2021
Description: Market Participants serving load within MISO must submit a Coincident Peak Load forecast(s) each year by midnight November 1
Keywords: Peak, Load Forecast, Submit, Resource Adequacy, Coincident Peak, Planning Year
Views: 24
Published On: Jan 26, 2021
Description: Describes the MISO calculation of unforced capacity for planning resources.
Keywords: Capacity, UCAP, Planning, Load Modifying, LMR, Resource Adequacy, PRA
Views: 501
Published On: Jan 26, 2021
Description: All generating resources intended to qualify as Planning Resources are required to perform a real power test to qualify as a planning resource.
Keywords: GVTC, Required, Generator, Test, Capacity, Resource Adequacy, Testing, Planning, GADS, PowerGADS
Views: 54
Published On: Jan 26, 2021
Description: Price separation between Local Resource Zones (LRZs), External Resource Zones (ERZs), or groupings of LRZs, including Sub-Regional Resource Zone (SRRZs)
Keywords: Zonal, Deliverability, ZDB, Resource Adequacy, Local Resource, LRZ, External Resource, ERZ, Sub-Regional, SRRZ, Planning, Auction
Views: 30
Published On: Jan 26, 2021
Description: Zonal Resource Credit (ZRC) is the unit of measure for resources participating in the Planning Resource Auction (PRA).
Keywords: Zonal, Resource, Credit, Resource Adequacy, Unforced Capacity, Resource Zone, Planning Year
Views: 1183
Published On: Jan 26, 2021
Description: Sumpin crazy bout Resource Adequacy
Keywords: Resource Adequacy, Adequacy
Views: 40
Published On: Jun 10, 2021